The Design and Construction Group (compromised of Thomas Huijbregts, Sarah Pearce, and Megan Wahab) was formed in late November, and were responsible for the design of the solution (including developing schematics), and identifying sources for building the solution.

Guys, summarize about what sections you are doing. -Sarah

This group was disbanded following the DesignAndConstructionProgressReport January 29th Progress Report. The discussion was focused on the group's process and a walk-through of the most updates design. Feedback from this design by the class can be found in Jan29Feedback. Following class feedback, the members seperated from the group and joined the Interior and Exterior Groups.

-- Main.s4pearce - 2015-03-21

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r3 - 2015-03-24 - s4pearce
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2018 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback